top of page



Australia’s 1,770MWh Eraring Battery 1 commences commercial operations
Australia has reached a major milestone in its energy transition with the start of commercial operations at Eraring Battery 1, a 460 MW / 1,770 MWh grid-scale battery energy storage system (BESS) located in New South Wales. The project is owned and operated by Origin Energy and is directly connected to the National Electricity Market (NEM).
Özcan Berk Atakan
2 days ago2 min read
bottom of page